How to Install Expanded Clay Cement Panel Correctly Step by Step Guide

Installing Expanded Clay Cement Panel is far simpler than building a traditional brick wall, but following the correct installation steps is critical to ensure the final wall remains crack free, stable and fully functional for decades. Many common problems like joint cracking, loose panels or uneven surfaces are not caused by the material itself, but by incorrect installation processes that skip key preparation and finishing steps.

Before you start installation, you first need to prepare the base surface and mark the wall position clearly. Clean up all dust, debris and loose material on the floor, ceiling and adjacent walls where the panel will be installed, then use a professional laser level to snap a clear horizontal and vertical reference line to mark the exact position of the new partition. This step ensures that all panels will be installed perfectly vertical and aligned, avoiding uneven stress that could cause cracks later. You also need to cut all Expanded Clay Cement Panel to the required size in advance using a dedicated electric circular saw with a diamond blade, which will create a smooth, clean cut edge without chipping the cement surface.

The next step is to install the top and bottom fixing tracks. Use U shaped galvanized steel tracks that match the thickness of your Expanded Clay Cement Panel, fix the bottom track to the floor using expansion bolts every 60cm, and fix the top track to the ceiling or floor slab in exactly the same way. Apply a thin layer of specialized polymer mortar inside the track before placing the panels, which will create a strong, flexible bond that absorbs minor structural movement and prevents cracking between the panel and the floor or ceiling.

When placing the panels, insert each Expanded Clay Cement Panel firmly into the top and bottom tracks, and make sure the vertical edge of the panel is perfectly aligned with the reference line you marked earlier. Leave a 3 to 5mm gap between adjacent panels, and fill this gap completely with the same specialized polymer mortar. After placing each panel, use a level to double check that it is completely vertical, and use temporary supporting brackets to hold it in place for at least 24 hours until the mortar is fully cured. For walls that are higher than 3 meters, you need to add extra horizontal galvanized steel connecting parts every 1.5 meters to connect all panels together, which greatly improves the overall stability and impact resistance of the full wall.

After all panels are installed and the mortar has fully cured, you can move on to the joint treatment step, which is the most important step to prevent long term cracking. First, use a special anti crack fiber mesh tape to cover all the joints between panels, then apply two layers of flexible anti crack putty over the top. Once the putty is fully dry, you can sand the surface smooth, and the Expanded Clay Cement Panel wall is ready for your final decorative treatment like painting, pasting wallpaper or tiling. Following these steps carefully will give you a smooth, stable, crack free partition wall that will last for decades without maintenance issues.