Step by Step Ceramsite Slab On Site Installation Standard Process

Standardized on-site installation process is the key to ensure that Ceramsite Slab gives full play to all its performance advantages and avoids common quality problems in later use. Before the formal installation, construction personnel first need to check the flatness and firmness of the supporting frame or the base layer of the structure, clean up all floating dust, debris and oil stains on the contact surface, and use the measuring tool to accurately pop up the positioning line of each slab according to the construction drawing.
When hoisting large-size Ceramsite Slab, special non-slip soft sling should be used to avoid damaging the board corners and the surface layer, and the slab should be placed stably on the pre-set supporting points, and no forced prying or violent knocking is allowed during the adjustment process. After the position is calibrated, special high-strength connecting accessories are used to fix the slab and the main structure firmly, and the gaps between the slabs are filled with matching inorganic anti-crack caulking mortar. After the mortar is initially set, a layer of anti-crack grid cloth is pasted on the caulking position to avoid cracking at the joint in the later stage. For the Ceramsite Slab used for exterior walls and roofs, after the caulking material is completely cured, the full-coverage anti-seepage coating construction should be carried out, and the subsequent finishing work can be carried out after the waterproof layer passes the water closing test.

Leave a Comment

Scroll to Top