Correct Ceramsite Panel construction site storage and protection guidelines can effectively avoid unnecessary product damage before installation. The panels should be stored in a flat dry place with at least 10cm high wooden sleepers under the bottom layer to prevent the panels from directly contacting accumulated water on the ground. The stacking height should not exceed 10 layers to avoid the bottom panels being crushed and deformed. It is also recommended to cover the top of the panel stack with waterproof tarpaulin to prevent long term direct exposure to heavy rain. Construction site managers who strictly follow these storage guidelines can reduce the Ceramsite Panel damage rate on site to less than 0.5 percent which greatly reduces unnecessary material waste and extra project cost.



