Correct on-site installation methods are the key to giving full play to all the performance advantages of Ceramsite Board, and following standardized construction processes can avoid common quality problems in later use. Before installation, workers need to check the flatness of the base structure, clean up all floating dust and debris on the supporting frame, and mark the positioning line of the plates accurately according to the design drawings. When hoisting large-size Ceramsite Board, it is necessary to use special non-slip spreader hooks to avoid collision and damage to the board corners, and the plates should be placed stably on the pre-set supporting points, and no forced prying or knocking is allowed during the fixing process.
After the plates are positioned, special matching connecting pieces should be used to connect the steel frame and the board body firmly, and the gaps between the plates should be filled with special inorganic caulking mortar, and the surface should be smoothed after the mortar is slightly solidified. For the external wall Ceramsite Board that needs to be pasted with exterior tiles or sprayed with exterior paint, it is necessary to roll a layer of anti-crack grid cloth on the surface of the board in advance, and then carry out the subsequent finishing construction after the base layer is completely cured. During the whole construction process, it is not allowed to arbitrarily cut the large holes on the Ceramsite Board without design permission. If it is necessary to reserve holes for pipelines, special tools should be used for precise cutting, so as to ensure that the structural strength of the board body is not damaged.



